Allied-telesis AT-VIEW PLUS 2.3 DEVICE MANAGEMENT Manuel d'utilisateur Page 157

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 224
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 156
Allied Telesyn AT-VIEW PLUS
DEVICE MANAGEMENT
PN 613-50507-00 Rev C Page 157 of 224
Rapier 48i
Device Manager LEDs for Rapier 48 and 48i
LED State Description
PWR
Green
Red
The switch is receiving power from the main power supply.
Main power supply is either off or has failed.
RPS
Green
Red
Gray
The switch is receiving power from the redundant power supply.
RPS has failed.
RPS is not installed or RPS monitoring is disabled.
DUPLEX
Green
Orange
The port is operating at full duplex.
The port is operating at half duplex.
Note - The current firmware version does not allow AT-View Plus Device Manager to support the
Reset button.
Note - Please refer to Uplink Modules for the operations and behavior of the uplink modules
installed in this device.
Note - To turn RPS monitoring on or off on the switch, from the switch command line interface
enter the command SET SYSTEM RPSMONITOR={ON|OFF}. To see whether RPS monitoring is
Vue de la page 156
1 2 ... 152 153 154 155 156 157 158 159 160 161 162 ... 223 224

Commentaires sur ces manuels

Pas de commentaire