613-001835 Rev. A
SwitchBlade x8106
Layer 3+ Chassis Switch
AT-SBx8106 Chassis
AT-SBx81GT24 Line Card
AT-SBx81GT40 Line Card
AT-SBx81GP24 PoE Line Card
AT-SBx81GS24a SFP Line Card
AT-SBx81XS6 SFP+ Line Card
AT-SBx81CFC400 Controller Fabric Card
AT-SBxPWRSYS1 AC System Power Supply
AT-SBxPWRSYS1 DC System Power Supply
AT-SBxPWRPOE1 PoE Power Supply
AT-SBxFAN06 Mo dule
Installation Guide
Vue de la page 0
1 2 3 4 5 6 ... 239 240

Résumé du contenu

Page 1 - Installation Guide

613-001835 Rev. ASwitchBlade x8106Layer 3+ Chassis Switch AT-SBx8106 Chassis AT-SBx81GT24 Line Card AT-SBx81GT40 Line Card AT-SBx81GP24 PoE Line C

Page 2

List of Figures10Figure 50: Unlocking the Handle on the AT-SBxPWRSYS1 Power Supply ...

Page 3 - Industry Canada

Chapter 4: Installing the Power Supplies1004. Check the model name, shown in Figure 55, to verify the module.If the module is the AT-SBxPWRSYS1 System

Page 4 - Translated Safety Statements

SwitchBlade x8106 Chassis Switch Installation Guide101Figure 57. Inserting the AT-SBxPWRPOE1 Power Supply

Page 5 - Contents

Chapter 4: Installing the Power Supplies1027. Lower the locking handle of the power supply module to secure the module in the slot, as shown in Figure

Page 6

SwitchBlade x8106 Chassis Switch Installation Guide103Installing the AT-SBxPWRSYS1 DC Power SupplyThis section contains the installation procedure for

Page 7

Chapter 4: Installing the Power Supplies104Figure 59. Removing the Blank Slot Cover from Power Supply Slot C3. Remove the power supply from the shippi

Page 8

SwitchBlade x8106 Chassis Switch Installation Guide105Figure 60. Items Included with the AT-SBxPWRSYS1 DC Power Supply ModuleNoteStore the packaging m

Page 9

Chapter 4: Installing the Power Supplies106Figure 61. Loosening the Handle locking Screw on the AT-SBxPWRPOE1 DC Power Supply5. Raise the locking hand

Page 10

SwitchBlade x8106 Chassis Switch Installation Guide107Figure 63. Inserting the AT-SBxPWRSYS1 DC Power Supply

Page 11

Chapter 4: Installing the Power Supplies1087. Lower the locking handle of the power supply module to secure the module in the slot, as shown in Figure

Page 12 - List of Figures

109Chapter 5Installing the AT-SBx81CFC400 Controller and Ethernet Line CardsThis chapter describes how to install the controller and Ethernet line car

Page 13

SwitchBlade x8106 Chassis Switch Installation Guide11Figure 110: Attaching the Bare Grounding Wire to the Grounding Post...

Page 14 - List of Tables

Chapter 5: Installing the AT-SBx81CFC400 Controller and Ethernet Line Cards110Guidelines to Handling the Controller and Line CardsPlease observe the f

Page 15

SwitchBlade x8106 Chassis Switch Installation Guide111Figure 65. Aligning Card in SlotCORRECTINCORRECTINCORRECT

Page 16

Chapter 5: Installing the AT-SBx81CFC400 Controller and Ethernet Line Cards112Installing the AT-SBx81CFC400 Controller Fabric CardThis section contain

Page 17 - Contacting Allied Telesis

SwitchBlade x8106 Chassis Switch Installation Guide113Figure 67. Items Included with the AT-SBx81CFC400 Controller Fabric CardNoteStore the packaging

Page 18

Chapter 5: Installing the AT-SBx81CFC400 Controller and Ethernet Line Cards114Figure 69. Opening the Locking Handles on the AT-SBx81CFC400 Controller

Page 19 - Overview

SwitchBlade x8106 Chassis Switch Installation Guide115Figure 71. Aligning the AT-SBx81CFC400 Card in the Chassis Slot7. Slowly and carefully slide the

Page 20 - Introduction

Chapter 5: Installing the AT-SBx81CFC400 Controller and Ethernet Line Cards116Figure 72. Closing the Locking Levers on the AT-SBx81CFC400 Controller F

Page 21

SwitchBlade x8106 Chassis Switch Installation Guide117Figure 73. Tightening the Thumb Screws on the AT-SBx81CFC400 Card10. Tighten the screws with a #

Page 22 - Figure 5. Fan Module

Chapter 5: Installing the AT-SBx81CFC400 Controller and Ethernet Line Cards118Installing the Ethernet Line CardsThis section contains the installation

Page 23 - AT-SBx8106 Chassis

SwitchBlade x8106 Chassis Switch Installation Guide119Figure 74. Removing an Ethernet Line Card from the Anti-static Bag4. Align the line card with th

Page 24 - Cards Slots

List of Figures12

Page 25

Chapter 5: Installing the AT-SBx81CFC400 Controller and Ethernet Line Cards120CautionKeep the card level with the chassis as you slide it into the slo

Page 26 - Chapter 1: Overview

SwitchBlade x8106 Chassis Switch Installation Guide121Figure 77. Tightening the Thumb Screws on an Ethernet Line Card8. Tighten the two screws with a

Page 27 - AT-SBx81GT24 Line Card

Chapter 5: Installing the AT-SBx81CFC400 Controller and Ethernet Line Cards122Installing the Blank Slot CoversAfter installing the AT-SBx81CFC400 Cont

Page 28 - AT-SBx81GT40 Line Card

SwitchBlade x8106 Chassis Switch Installation Guide123Figure 79. Tightening the Thumbscrews on a Blank Slot Cover3. Tighten the two screws with a # 2

Page 29 - AT-SBx81GP24 PoE Line Card

Chapter 5: Installing the AT-SBx81CFC400 Controller and Ethernet Line Cards124

Page 30 - AT-SBx81GS24a SFP Line Card

125Chapter 6Installing the Transceivers and Cabling the PortsThis chapter describes how to install the fiber optic transceivers and attach the cables

Page 31 - AT-SBx81XS6 SFP+ Line Card

Chapter 6: Installing the Transceivers and Cabling the Ports126Cabling Guidelines for the Twisted Pair Ports on the AT-SBx81GT24, AT-SBx81GP24, and AT

Page 32

SwitchBlade x8106 Chassis Switch Installation Guide127 The default wiring configuration of the ports is automatic MDIX detection, which configures th

Page 33 - Requirements

Chapter 6: Installing the Transceivers and Cabling the Ports128Figure 81. Connecting Cables to Ports on the AT-SBx81GT40 Line CardRelease tabConnectin

Page 34 - Detection

SwitchBlade x8106 Chassis Switch Installation Guide129Guidelines to Installing SFP and SFP+ TransceiversPlease review the following guidelines before

Page 35 - Powered Device

13Table 1. Twisted Pair Cable for the AT-SBx81GT24 and AT-SBx81GT40 Line Cards ...33Table 2. Twi

Page 36

Chapter 6: Installing the Transceivers and Cabling the Ports130Installing SFP Transceivers in the AT-SBx81GS24a Line CardPlease review the information

Page 37

SwitchBlade x8106 Chassis Switch Installation Guide1313. To install the transceiver in an SFP slot on the top row of the line card, orient the transce

Page 38 - Line Card

Chapter 6: Installing the Transceivers and Cabling the Ports132Figure 85. Removing the Dust Cover from the SFP Transceiver in the AT-SBx81GS24a Line C

Page 39 - AT-SBx81GT40

SwitchBlade x8106 Chassis Switch Installation Guide1337. Connect the fiber optic cable to the port on the transceiver, as shown in Figure 87. The conn

Page 40

Chapter 6: Installing the Transceivers and Cabling the Ports134Installing SFP+ Transceivers in the AT-SBx81XS6 Line CardPlease review the information

Page 41 - AT-SBx81GP24

SwitchBlade x8106 Chassis Switch Installation Guide135Figure 89. Handle on SFP+ Transceiver3. Slide the transceiver into the slot until it clicks into

Page 42 - AT-SBx81GS24a

Chapter 6: Installing the Transceivers and Cabling the Ports136Figure 91. Removing the Dust Cover from an SFP+ Transceiver in the AT-SBx81XS6 Line Car

Page 43 - AT-SBx81XS6

SwitchBlade x8106 Chassis Switch Installation Guide1376. Connect the fiber optic cable to the port on the transceiver, as shown in Figure 93. The conn

Page 44

Chapter 6: Installing the Transceivers and Cabling the Ports138Installing AT-SP10TW Cables in the AT-SBx81XS6 Line CardThis procedure explains how to

Page 45

SwitchBlade x8106 Chassis Switch Installation Guide139Figure 95. Release Tab on the AT-SBx81XS6 Line Card3. Slide the connector into the slot until it

Page 46

List of Tables14

Page 47 - SBx STATUS

Chapter 6: Installing the Transceivers and Cabling the Ports140NoteTo remove the connector and cable from the SFP+ slot, gently push on the connector,

Page 48

SwitchBlade x8106 Chassis Switch Installation Guide141Cabling the NET MGMT Port on the AT-SBx81CFC400 CardThe controller card must have access to your

Page 49 - NET MGMT

Chapter 6: Installing the Transceivers and Cabling the Ports142This setting is appropriate for port if it is connected to a network device that also s

Page 50

143Chapter 7Powering On the ChassisThis chapter describes how to power on the chassis and monitor the initialization process. The chapter contains the

Page 51 - Console (RS-232)

Chapter 7: Powering On the Chassis144Verifying the InstallationPlease perform the following procedure before powering on the chassis:1. Verify that th

Page 52

SwitchBlade x8106 Chassis Switch Installation Guide145Powering On the AT-SBxPWRSYS1 AC Power SupplyThe procedure in this section explains how to power

Page 53 - AT-SBxPWRSYS1 AC Power Supply

Chapter 7: Powering On the Chassis146Figure 98. Connecting the AC Power Cord for the AT-SBxPWRSYS1 AC Power Supply3. Use the twist tie included with t

Page 54

SwitchBlade x8106 Chassis Switch Installation Guide147Figure 99. Securing the Power Cord for the AT-SBxPWRSYS1 AC Power Supply to an Anchor4. Connect

Page 55 - AT-SBxPWRPOE1 Power Supply

Chapter 7: Powering On the Chassis148Powering On the AT-SBxPWRPOE1 Power SupplyIf you have not already installed the AT-SBxPWRPOE1 Power Supplies, ref

Page 56

SwitchBlade x8106 Chassis Switch Installation Guide1493. Use the twist tie that comes with the power supply to secure the cord to an anchor on the cha

Page 57

15PrefaceThis guide contains the hardware installation instructions for the Layer 3+ SwitchBlade x8106 Chassis Switch. The preface contains the follow

Page 58

Chapter 7: Powering On the Chassis150Figure 102. Dress and Secure AC Power Cords6. Go to “Monitoring the Initialization Process” on page 177.

Page 59 - AT-SBxFAN06 Module

SwitchBlade x8106 Chassis Switch Installation Guide151Powering On the AT-SBxPWRSYS1 DC System Power SupplyThis section contains instructions on how to

Page 60

Chapter 7: Powering On the Chassis152The components of the power supply are identified in Figure 103.Figure 103. Components of the AT-SBxPWRSYS1 DC Po

Page 61

SwitchBlade x8106 Chassis Switch Installation Guide153Choosing aMethod forAttaching theGrounding WireYou may attach the grounding wire to the power su

Page 62

Chapter 7: Powering On the Chassis1543. Use an 8 mm wrench to remove the grounding post nut and washer, shown in Figure 107, from the power supply.Fig

Page 63 - Safety Precautions and Site

SwitchBlade x8106 Chassis Switch Installation Guide155Figure 108. Installing the Grounding Wire5. Connect the other end of the grounding wire to the b

Page 64 - Reviewing Safety Precautions

Chapter 7: Powering On the Chassis156Connecting theGrounding Wirewith Bare WireTo attach the grounding wire to the power supply with bare wire, perfor

Page 65

SwitchBlade x8106 Chassis Switch Installation Guide1574. Secure the wire with the nut and washer removed in step 2, and an 8 mm wrench, as shown in Fi

Page 66

Chapter 7: Powering On the Chassis158Choosing aMethod forAttaching thePower WiresThe AT-SBxPWRSYS1 DC Power Supply comes with the two sets of power wi

Page 67

SwitchBlade x8106 Chassis Switch Installation Guide159Figure 113. Stripping the Power WiresNoteYou must use stranded wires with the terminal lugs. You

Page 68

Preface16Safety Symbols Used in this DocumentThis document uses the following conventions.NoteNotes provide additional information.CautionCautions inf

Page 69

Chapter 7: Powering On the Chassis160Figure 115. On/Off Switch on the AT-SBxPWRSYS1 DC Power Supply4. Use a #1 Phillips-head screwdriver to loosen the

Page 70

SwitchBlade x8106 Chassis Switch Installation Guide161Figure 116. Opening the Plastic Cover5. Use a #3 Phillips-head screwdriver to remove the two scr

Page 71 - Chapter 3

Chapter 7: Powering On the Chassis162Figure 117. Removing the Terminal Screws6. With a #3 Phillips-head screwdriver, connect the positive (+) power le

Page 72 - Required Tools and Material

SwitchBlade x8106 Chassis Switch Installation Guide163Figure 118. Connecting the Positive (+) Power Wire with a Straight Terminal7. With a #3 Phillips

Page 73 - Preparing the Equipment Rack

Chapter 7: Powering On the Chassis164Figure 119. Connecting the Negative (-) Power Wire with a Straight TerminalWarningCheck to see if there are any e

Page 74 - 342.4 mm (13.5”)

SwitchBlade x8106 Chassis Switch Installation Guide165Figure 120. Closing the Plastic Cover over the Terminal ConnectorsCautionDo not over tighten the

Page 75

Chapter 7: Powering On the Chassis166Figure 121. Tightening the Handle Locking Screw10. Before attaching the power wires from the power supply to the

Page 76

SwitchBlade x8106 Chassis Switch Installation Guide167Connecting theDC Power Wireswith the RightAngle TerminalsTo connect the DC power wires to the po

Page 77

Chapter 7: Powering On the Chassis1684. Using a #1 Phillips-head screwdriver, remove the two screws that secure the plastic cover over the positive an

Page 78 - Removing the Rubber Feet

SwitchBlade x8106 Chassis Switch Installation Guide169Figure 125. Removing the Terminal Screws6. With a #3 Phillips-head screwdriver, connect the posi

Page 79 - 3. Turn the chassis over

SwitchBlade x8106 Chassis Switch Installation Guide17Contacting Allied TelesisIf you need assistance with this product, you may contact Allied Telesis

Page 80

Chapter 7: Powering On the Chassis170Figure 126. Connecting the Positive (+) Power Wire with a Right Angle Terminal7. With a #3 Phillips-head screwdri

Page 81 - “Dim X” “Dim X” “Dim X”

SwitchBlade x8106 Chassis Switch Installation Guide171Figure 127. Connecting the Negative (-) Power Wire with a Right Angle TerminalWarningCheck to se

Page 82

Chapter 7: Powering On the Chassis172Figure 128. Tightening the Handle Locking Screw9. Before attaching the power wires from the power supply to the c

Page 83

SwitchBlade x8106 Chassis Switch Installation Guide173Connecting BareDC Power WiresTo attach bare lead wires to the positive and negative terminals on

Page 84

Chapter 7: Powering On the Chassis174Figure 130. Connecting the Positive Lead Wire5. Wrap the negative lead wire clockwise around the remaining termin

Page 85

SwitchBlade x8106 Chassis Switch Installation Guide175Figure 131. Connecting the Negative Lead WireAllied Telesis recommends tightening the screw to 3

Page 86 - Removing the Shipping Brace

Chapter 7: Powering On the Chassis1767. With a #2 Phillips-head screwdriver, tighten the handle locking screw to secure the power supply to the chassi

Page 87

SwitchBlade x8106 Chassis Switch Installation Guide177Monitoring the Initialization ProcessThe line and controller cards perform an initialization pro

Page 88

Chapter 7: Powering On the Chassis178Figure 132. Switch Initialization MessagesVerifying release... OKBooting...Starting base/first... [ OK ]Mounting

Page 89 - Installing the Power Supplies

SwitchBlade x8106 Chassis Switch Installation Guide179Figure 133. Switch Initialization Messages (Continued)auth, bgpd, cntrd, epsr, exfx, hostd, hsli

Page 90

Preface18

Page 91

Chapter 7: Powering On the Chassis180

Page 92

181Chapter 8Verifying the Hardware Operations of the ChassisThis chapter describes how to verify the operations of the chassis. The chapter contains t

Page 93

Chapter 8: Verifying the Hardware Operations of the Chassis182Using the LEDs to Verify the ChassisAfter powering on the chassis for the first time and

Page 94

SwitchBlade x8106 Chassis Switch Installation Guide183preventing them from completing the initialization process. Power off the chassis and replace th

Page 95

Chapter 8: Verifying the Hardware Operations of the Chassis184Using Local Management to Verify the ChassisThis section explains how to use the command

Page 96

SwitchBlade x8106 Chassis Switch Installation Guide1852. Connect the other end of the cable to an RS-232 port on a terminal or personal computer with

Page 97

Chapter 8: Verifying the Hardware Operations of the Chassis186Figure 135. SHOW VERSION Command2. Compare the version number displayed by the SHOW VERS

Page 98

SwitchBlade x8106 Chassis Switch Installation Guide1876. To check the status of PoE on the ports of the AT-SBx81GP24 Line Card, use the SHOW POWER-INL

Page 99

Chapter 8: Verifying the Hardware Operations of the Chassis188

Page 100

189Chapter 9TroubleshootingThis chapter contains information on how to troubleshoot the SwitchBlade x8106 product.NoteIf you are unable to resolve a h

Page 101

19Chapter 1OverviewThis chapter describes the Layer 3+ SwitchBlade x8106 Chassis Switch in the following sections: “Introduction” on page 20 “AT-SBx

Page 102

Chapter 9: Troubleshooting190AT-SBxPWRSYS1 and AT-SBxPWRPOE1 AC Power SuppliesA power supply is operating normally when its AC and DC LEDs are solid g

Page 103

SwitchBlade x8106 Chassis Switch Installation Guide191AT-SBxPWRSYS1 DC Power SupplyIf you suspect a problem with the DC power supply, examine its LEDs

Page 104

Chapter 9: Troubleshooting192software version on the control card, refer to “Using Local Management to Verify the Chassis” on page 184 and “AlliedWare

Page 105

SwitchBlade x8106 Chassis Switch Installation Guide193Ethernet Line CardsA quick and easy way to check the overall heath of the Ethernet line cards in

Page 106

Chapter 9: Troubleshooting194 You can obtain card status information with the SwitchBlade x8106 Management Software and the SHOW CARD command, as fol

Page 107

SwitchBlade x8106 Chassis Switch Installation Guide195Twisted Pair PortsThe ports on the AT-SBx81GT24 and AT-SBx81GP24 Line Cards have L/A LEDs that a

Page 108

Chapter 9: Troubleshooting196 The default duplex mode setting for the ports is Auto-Negotiation. This setting is appropriate for ports connected to n

Page 109 - Chapter 5

SwitchBlade x8106 Chassis Switch Installation Guide197Power Over EthernetThis section applies only to the AT-SBx81GP24 Line Card. Each port has two LE

Page 110

Chapter 9: Troubleshooting198 Use the SHOW POE CARD command to determine whether the switch has reach its maximum power budget. Try connecting the P

Page 111 - INCORRECT

SwitchBlade x8106 Chassis Switch Installation Guide199Fiber Optic TransceiversThe L/A LEDs on the AT-SBx81GS24a and AT-SBx81XS6 Line Cards are solid o

Page 112

Copyright  2013 Allied Telesis, Inc. All rights reserved. No part of this publication may be reproduced without prior written permission from Allied

Page 113

Chapter 1: Overview20IntroductionThe SwitchBlade x8106 product is a modular Layer 3+ Ethernet switch. The main components are the AT-SBx8106 Chassis,

Page 114

Chapter 9: Troubleshooting200AT-SBx81CFC400 Controller Fabric CardIf the chassis has one controller card and the card fails, all network operations st

Page 115

SwitchBlade x8106 Chassis Switch Installation Guide201AT-SBxFAN06 Fan ModuleThe AT-SBxFAN06 Fan Module is operating correctly when the POWER LED on th

Page 116 - Controller Fabric Card

Chapter 9: Troubleshooting202Local (Out-of-Band) Management SessionIf you are unable to establish a local (out-of-band) management session with the sw

Page 117

SwitchBlade x8106 Chassis Switch Installation Guide203Power Supply Interfaces (Opto-couplers)The two power supply interfaces in the lower right corner

Page 118

Chapter 9: Troubleshooting204

Page 119

205Chapter 10Replacing ModulesThis chapter contains procedures on how to replace modules in the unit. The chapter contains the following sections: “R

Page 120

Chapter 10: Replacing Modules206Replacing AT-SBxPWRSYS1 AC and AT-SBxPWRPOE1 Power SuppliesThis section contains the procedure for removing AT-SBxPWRS

Page 121

SwitchBlade x8106 Chassis Switch Installation Guide2072. Lift the locking hand on the power supply. Refer to Figure 138.Figure 138. Lifting the Lockin

Page 122

Chapter 10: Replacing Modules208Figure 139. Removing the Power Supply from the Chassis4. Do one of the following: To install a new power supply, refe

Page 123

SwitchBlade x8106 Chassis Switch Installation Guide209Figure 140. Installing a Blank Power Supply Slot Cover6. Lower the locking handle to secure the

Page 124

SwitchBlade x8106 Chassis Switch Installation Guide21Figure 3. Ethernet Line Cards and Controller Card (Continued)Figure 4 illustrates the power suppl

Page 125 - Chapter 6

Chapter 10: Replacing Modules210Figure 141. Lowering the Locking Handle on the Power Supply Slot Cover

Page 126

SwitchBlade x8106 Chassis Switch Installation Guide211Replacing the AT-SBxPWRSYS1 DC Power SupplyTo remove an AT-SBxPWRSYS1 DC Power Supply from the c

Page 127 - SBx81GT40 Line

Chapter 10: Replacing Modules212NoteIf the power wires are connected to the terminal block with the right angle terminals, go to step 5.4. Use a #1 sc

Page 128

SwitchBlade x8106 Chassis Switch Installation Guide213Figure 144. Removing the Negative Lead Wire6. Use a #3 screwdriver to remove the positive (+) le

Page 129

Chapter 10: Replacing Modules214Figure 145. Removing the Positive Lead Wire from the Terminal Block7. Reinstall the two screws on the negative (-) and

Page 130

SwitchBlade x8106 Chassis Switch Installation Guide215Figure 146. Reinstalling the Screws on the Positive and Negative Terminals8. Slide the plastic c

Page 131

Chapter 10: Replacing Modules216Figure 147. Closing the Plastic Cover9. Use an 8 mm wrench to remove the grounding wire from the grounding post. Refer

Page 132

SwitchBlade x8106 Chassis Switch Installation Guide217Figure 148. Removing the Grounding Wire10. Reinstall the nut and washer on the grounding post. R

Page 133

Chapter 10: Replacing Modules218Figure 149. Reinstalling the Nut and Washer on the Grounding Post11. Lift the locking handle and slide the power suppl

Page 134

SwitchBlade x8106 Chassis Switch Installation Guide219Figure 150. Lifting the Locking Handle and Removing the Power Supply12. Do one of the following:

Page 135

Chapter 1: Overview22Figure 5 illustrates the fan module.Figure 5. Fan ModuleAT-SBxFAN06 Module. The cooling module for the chassis.

Page 136

Chapter 10: Replacing Modules220Figure 151. Installing a Blank Power Supply Slot Cover14. Lower the locking handle to secure the slot cover to the slo

Page 137

SwitchBlade x8106 Chassis Switch Installation Guide221Figure 152. Lowering the Locking Handle on the Power Supply Slot Cover

Page 138

Chapter 10: Replacing Modules222Replacing Ethernet Line CardsThis section contains the procedure for replacing Ethernet line cards in the chassis.Note

Page 139

SwitchBlade x8106 Chassis Switch Installation Guide223instructions, refer to “Installing the Blank Slot Covers” on page 122. If you do not plan to im

Page 140

Chapter 10: Replacing Modules224Replacing the AT-SBx81CFC400 Controller Fabric CardThis section contains the procedure for replacing a controller card

Page 141

SwitchBlade x8106 Chassis Switch Installation Guide225NoteYou should not replace a controller card in a chassis that has two controller cards while th

Page 142

Chapter 10: Replacing Modules226Replacing the AT-SBxFAN06 Fan ModuleThis section contains the procedures for replacing the AT-SBxFAN06 Fan Module. The

Page 143 - Powering On the Chassis

SwitchBlade x8106 Chassis Switch Installation Guide227Figure 153. Loosening the Screw on the AT-SBxFAN06 Fan Module3. Carefully pull on the handle to

Page 144 - Verifying the Installation

Chapter 10: Replacing Modules2284. Slowly pull the module out 25 mm (1 in.). Refer to Figure 155.Figure 155. Withdrawing the AT-SBxFAN06 Fan Module 25

Page 145

SwitchBlade x8106 Chassis Switch Installation Guide229Figure 156. Removing the AT-SBxFAN06 Fan Module from the ChassisInstalling a NewAT-SBxFAN06Fan M

Page 146 - Power Supply

SwitchBlade x8106 Chassis Switch Installation Guide23AT-SBx8106 ChassisThe AT-SBx8106 Chassis is a 4RU unit with slots for four Ethernet line cards, t

Page 147

Chapter 10: Replacing Modules230Figure 157. Installing a New AT-SBxFAN06 Fan Module2. When you feel the fan module make contact with the connector on

Page 148

SwitchBlade x8106 Chassis Switch Installation Guide231Figure 158. Securing the AT-SBxFAN06 Fan Module on the Backplane Connector3. With a #2 Phillips-

Page 149

Chapter 10: Replacing Modules232

Page 150

233Appendix ATechnical SpecificationsPhysical SpecificationsDimensions (W x D x H)Weight (Kilograms)Table 21. Product DimensionsAT-SBx8106 Chassis 4

Page 151

Appendix A: Technical Specifications234AT-SBx81GS24a SFP Line Card 1.06 kg (2.34 lb)AT-SBx81XS6 SFP+ Line Card 1.06 kg (2.34 lb)AT-SBx81CFC400 Control

Page 152

SwitchBlade x8106 Chassis Switch Installation Guide235Environmental SpecificationsNoteThe acoustic noise was measured at 40° C with the following prod

Page 153

Appendix A: Technical Specifications236Power SpecificationsAC Voltage, Frequency Requirements (Volts, Hertz)CC Voltage RequirementsTypical power savin

Page 154

SwitchBlade x8106 Chassis Switch Installation Guide237Maximum power supply efficiency (based on 100V input voltage)Heat dissipation (British Thermal U

Page 155

Appendix A: Technical Specifications238PoE ModeSafety and Electromagnetic Emissions CertificationsSafety and Electromagnetic Emissions:Table 32. Ava

Page 156 - Grounding Wire

SwitchBlade x8106 Chassis Switch Installation Guide239Port PinoutsThis section lists the port pinouts for the AT-SBx81GT24, AT-SBx81GT40, and AT-SBx81

Page 157

Chapter 1: Overview24Figure 7. Rear View of the AT-SBx8106 ChassisFigure 8 is an example of a fully populated chassis.Figure 8. AT-SBx8106 Chassis wit

Page 158

Appendix A: Technical Specifications240Table 37 lists the port pin signals when a 10/100/1000Base-T port is operating at 1000 Mbps.Table 37. 1000Bas

Page 159

SwitchBlade x8106 Chassis Switch Installation Guide25Figure 9. Ethernet Line and Controller Cards SlotsSlots 1 to 4 are for the Ethernet line cards. T

Page 160

Chapter 1: Overview26power so that the chassis can support more powered devices and adds power redundancy. For more information, refer to “Power over

Page 161

SwitchBlade x8106 Chassis Switch Installation Guide27AT-SBx81GT24 Line CardThe AT-SBx81GT24 Line Card, shown in Figure 11, is a Gigabit Ethernet switc

Page 162

Chapter 1: Overview28AT-SBx81GT40 Line CardThe AT-SBx81GT40 Line Card, shown in Figure 12, is a Gigabit Ethernet switch.Figure 12. AT-SBx81GT40 Line C

Page 163

SwitchBlade x8106 Chassis Switch Installation Guide29AT-SBx81GP24 PoE Line CardThe AT-SBx81GP24 PoE Line Card, shown in Figure 13, is a Gigabit Ethern

Page 164

3Electrical Safety and Emissions StandardsThis product meets the following standards.EMI/RFI Emissions: FCC Class A, EN55022 Class A, EN61000-3-2, EN6

Page 165

Chapter 1: Overview30AT-SBx81GS24a SFP Line CardThe AT-SBx81GS24a SFP Line Card, shown in Figure 14, is a Gigabit Ethernet switch.Figure 14. AT-SBx81G

Page 166

SwitchBlade x8106 Chassis Switch Installation Guide31AT-SBx81XS6 SFP+ Line CardThe AT-SBx81XS6 Line Card, shown in Figure 15, is a 10 Gigabit Ethernet

Page 167 - Angle Terminals

Chapter 1: Overview3210/100/1000Base-T Twisted Pair PortsThis section applies to the 10/100/1000Base-T ports on the AT-SBx81GT24, AT-SBx81GT40, and AT

Page 168

SwitchBlade x8106 Chassis Switch Installation Guide33MaximumDistanceThe ports have a maximum operating distance of 100 meters (328 feet).CableRequirem

Page 169

Chapter 1: Overview34Automatic MDIXDetectionThe 10/100/1000 Mbps twisted-pair ports on the AT-SBx81GT24, AT-SBx81GT40, and AT-SBx81GP24 Line Cards are

Page 170

SwitchBlade x8106 Chassis Switch Installation Guide35Power over Ethernet on the AT-SBx81GP24 Line CardThis section applies to the AT-SBx81GP24 PoE Lin

Page 171

Chapter 1: Overview36Power Budgeting The power for PoE on the ports on the AT-SBx81GP24 Line Card is provided by the AT-SBxPWRPOE1 Power Supply. It ca

Page 172

SwitchBlade x8106 Chassis Switch Installation Guide37PDs that comply with the IEEE 802.3af and 802.3at standards typically support both power delivery

Page 173 - Connecting Bare

Chapter 1: Overview38Port LEDs on the Ethernet Line CardsThe following sections define the port LEDs on the Ethernet line cards.AT-SBx81GT24Line CardE

Page 174

SwitchBlade x8106 Chassis Switch Installation Guide39AT-SBx81GT40Line CardThe LEDs for a port on the AT-SBx81GT40 Line Card are found on the RJ point

Page 175

SwitchBlade x8106 Chassis Switch Installation Guide4Translated Safety StatementsImportant: The  indicates that a translation of the safety statement

Page 176

Chapter 1: Overview40Figure 18. Port LEDs on an RJ Point 5 Cable Connector for the AT-SBx81GT40 Line CardTable 6. Port LEDs on the AT-SBx81GT40 Line

Page 177

SwitchBlade x8106 Chassis Switch Installation Guide41AT-SBx81GP24Line CardEach port on the AT-SBx81GP24 PoE Line Card has two LEDs. The LEDs are shown

Page 178

Chapter 1: Overview42AT-SBx81GS24aLine CardThe SFP slots on the AT-SBx81GS24a SFP Line Card have one LED each, as shown in Figure 20 and described in

Page 179

SwitchBlade x8106 Chassis Switch Installation Guide43AT-SBx81XS6Line CardThe AT-SBx81XS6 Line Card has one LED for each SFP+ slot. The LED is shown in

Page 180

Chapter 1: Overview44AT-SBx81CFC400 Controller Fabric CardThe AT-SBx81CFC400 Controller Fabric Card has three primary functions: Chassis Management —

Page 181 - Chapter 8

SwitchBlade x8106 Chassis Switch Installation Guide45The components on the card are identified in Figure 22.Figure 22. AT-SBx81CFC400 Controller Fabri

Page 182

Chapter 1: Overview46Table 10. SYS (System) Status LEDsLED State DescriptionCFCSolid Green Indicates that the AT-SBx81CFC400 Controller Fabric Card

Page 183

SwitchBlade x8106 Chassis Switch Installation Guide47SBx STATUSLEDsThe SBx LINECARD STATUS LEDs display general status information about the Ethernet

Page 184 - Management

Chapter 1: Overview48eco-friendlyButtonYou may use the eco-friendly button on the controller card to turn the LEDs on or off. You may turn off the LED

Page 185 - Commands

SwitchBlade x8106 Chassis Switch Installation Guide49NoteThe available bandwidth across the backplane of the chassis is reduced from 80 Gbps per slot

Page 186

5Preface ...

Page 187

Chapter 1: Overview50Table 12. Features that Use the NET MGMT PortFeature DescriptionPing Used to test the NET MGMT port for network connectivity.FT

Page 188

SwitchBlade x8106 Chassis Switch Installation Guide51The NET MGMT port has a standard RJ-45 8-pin connector and operates at 10, 100, or 1000 Mbps in e

Page 189 - Troubleshooting

Chapter 1: Overview52USB Port The USB port supports a flash drive. You may use a flash drive to perform the following management functions: Store bac

Page 190

SwitchBlade x8106 Chassis Switch Installation Guide53AT-SBxPWRSYS1 AC Power SupplyThe AT-SBxPWRSYS1 AC Power Supply, shown in Figure 23, is the power

Page 191 - AT-SBxPWRSYS1 DC Power Supply

Chapter 1: Overview54DCSolid Green The power supply is providing DC power that is within the normal operating range.Off The power supply is not genera

Page 192 - Chapter 9: Troubleshooting

SwitchBlade x8106 Chassis Switch Installation Guide55AT-SBxPWRPOE1 Power SupplyThe AT-SBxPWRPOE1 Power Supply, shown in Figure 24, provides the PoE po

Page 193 - Ethernet Line Cards

Chapter 1: Overview56Table 15. AT-SBxPWRPOE1 Power Supply LEDsLED State DescriptionACSolid Green The power supply is receiving AC power that is with

Page 194

SwitchBlade x8106 Chassis Switch Installation Guide57AT-SBxPWRSYS1 DC Power SupplyThe AT-SBxPWRSYS1 DC Power Supply, shown in Figure 25, is a DC versi

Page 195 - Twisted Pair Ports

Chapter 1: Overview58NoteGiven that the AT-SBxPWRSYS1 DC Power Supply is not compatible with the AT-SBxPWRPOE1 AC Power Supply, a chassis that contain

Page 196

SwitchBlade x8106 Chassis Switch Installation Guide59AT-SBxFAN06 ModuleThe AT-SBxFAN06 Module is the cooling unit for the chassis. Refer to Figure 26.

Page 197 - Power Over Ethernet

Contents6AT-SBxPWRSYS1 DC Power Supply... 5

Page 198

Chapter 1: Overview60Power Supply Interfaces (Opto-couplers)The chassis has two power supply interfaces, also referred to as opto-couplers, in the low

Page 199 - Fiber Optic Transceivers

SwitchBlade x8106 Chassis Switch Installation Guide61Table 18. Power Supply Interface LEDLED State DescriptionPowerSolid Green The interface is oper

Page 200

Chapter 1: Overview62AlliedWare Plus Software Releases for the Hardware ComponentsTable 19 lists the releases of the AlliedWare Plus Operating System

Page 201 - AT-SBxFAN06 Fan Module

63Chapter 2Safety Precautions and Site RequirementsThis chapter contains the safety precautions and guidelines for selecting a site for the chassis. T

Page 202

Chapter 2: Safety Precautions and Site Requirements64Reviewing Safety PrecautionsPlease review the following safety precautions before you begin to in

Page 203

SwitchBlade x8106 Chassis Switch Installation Guide65NotePluggable Equipment. The socket outlet shall be installed near the equipment and shall be eas

Page 204

Chapter 2: Safety Precautions and Site Requirements66WarningMounting of the equipment in the rack should be such that a hazardous condition is not cre

Page 205 - Replacing Modules

SwitchBlade x8106 Chassis Switch Installation Guide67WarningReliable earthing of rack-mounted equipment should be maintained. Particular attention sho

Page 206 - Supplies

Chapter 2: Safety Precautions and Site Requirements68Selecting a Site for the SwitchBlade x8106Please perform the following procedure to determine the

Page 207

SwitchBlade x8106 Chassis Switch Installation Guide69Figure 28. 100 - 125 VAC 125 V NEMA 5-20 Plug and Receptacle

Page 208 - Chapter 10: Replacing Modules

SwitchBlade x8106 Chassis Switch Installation Guide7Monitoring the Initialization Process ...

Page 209 - Figure 141 on page 210

Chapter 2: Safety Precautions and Site Requirements70Installation Tools and MaterialThis section lists the tools and material you need to supply to in

Page 210

71Chapter 3Installing the Chassis in an Equipment RackThis chapter describes how to install the AT-SBx8106 Chassis in an equipment rack. This chapter

Page 211

Chapter 3: Installing the Chassis in an Equipment Rack72Required Tools and MaterialYou need the following tools and material to install the product in

Page 212

SwitchBlade x8106 Chassis Switch Installation Guide73Preparing the Equipment RackTo prepare the equipment rack for the AT-SBx8106 Chassis, perform the

Page 213

Chapter 3: Installing the Chassis in an Equipment Rack74Figure 29. Reserving Vertical Rack Space190.0 mm (7.5“)152.4 mm (6”0)342.4 mm (13.5”)

Page 214

SwitchBlade x8106 Chassis Switch Installation Guide753. Identify the lowest 1/2” screw hole pattern on the rack mounting rails within the space reserv

Page 215

Chapter 3: Installing the Chassis in an Equipment Rack76Unpacking the AT-SBx8106 ChassisTo unpack the AT-SBx8106 Chassis, perform the following proced

Page 216

SwitchBlade x8106 Chassis Switch Installation Guide77Figure 32. Components of the AT-SBx8106 Chassis (Continued)Two equipment rack brackets pre-instal

Page 217 - 149 on page 218

Chapter 3: Installing the Chassis in an Equipment Rack78Removing the Rubber FeetThe chassis comes with rubber feet on the base panel for tabletop inst

Page 218

SwitchBlade x8106 Chassis Switch Installation Guide79Figure 34. Removing the Rubber Feet3. Turn the chassis over.Go to the next procedure, “Adjusting

Page 219

Contents8

Page 220 - Figure 152 on page 221

Chapter 3: Installing the Chassis in an Equipment Rack80Adjusting the Equipment Rack BracketsThe chassis has two pre-installed equipment rack brackets

Page 221

SwitchBlade x8106 Chassis Switch Installation Guide81Figure 35. Rack Mounting Bracket LocationsFigure 36. Rack Bracket Locations for Reverse Position

Page 222 - Replacing Ethernet Line Cards

Chapter 3: Installing the Chassis in an Equipment Rack82Installing the Chassis in the Equipment RackThe procedure in this section explains how to inst

Page 223

SwitchBlade x8106 Chassis Switch Installation Guide832. Lift the AT-SBx8106 Chassis into the equipment rack and set the bottom of the equipment rack b

Page 224

Chapter 3: Installing the Chassis in an Equipment Rack84Figure 38. Installing the Rack Mount Screws5. Tighten all six screws shown in Figure 39 on pag

Page 225

SwitchBlade x8106 Chassis Switch Installation Guide85Figure 39. Tightening the Rack Mount Screws6. Go to “Removing the Shipping Brace” on page 86.Scre

Page 226 - Fan Module

Chapter 3: Installing the Chassis in an Equipment Rack86Removing the Shipping BraceNow that the chassis is installed in the equipment rack, you may re

Page 227 - Connector

SwitchBlade x8106 Chassis Switch Installation Guide87Installing the Chassis Grounding LugThis procedure explains how to connect a grounding wire to th

Page 228

Chapter 3: Installing the Chassis in an Equipment Rack883. Insert one end of the grounding wire into the grounding lug, as shown in Figure 43, and use

Page 229 - Installing a New

89Chapter 4Installing the Power SuppliesThis chapter explains how to install the power supplies. It has the following sections: “Protecting Against E

Page 230

9FiguresFigure 1: AT-SBx8106 Chassis ...

Page 231

Chapter 4: Installing the Power Supplies90Protecting Against Electrostatic Discharge (ESD)To protect the equipment from damage by Electrostatic Discha

Page 232

SwitchBlade x8106 Chassis Switch Installation Guide91Installing the AT-SBxPWRSYS1 AC System Power SupplyFor background information on the AT-SBxPWRSYS

Page 233 - Technical Specifications

Chapter 4: Installing the Power Supplies92Figure 47. Removing the Blank Slot Cover from Power Supply Slot C3. Remove the new AT-SBxPWRSYS1 Power Suppl

Page 234

SwitchBlade x8106 Chassis Switch Installation Guide93Figure 48. Items Included with the AT-SBxPWRSYS1 Power Supply ModuleNoteStore the packaging mater

Page 235 - Environmental Specifications

Chapter 4: Installing the Power Supplies944. Check the power supply for its model name, shown in Figure 49, to verify the module.If the module is the

Page 236 - Power Specifications

SwitchBlade x8106 Chassis Switch Installation Guide956. Align and insert the AT-SBxPWRSYS1 Power Supply into the power supply slot. Figure 51 shows th

Page 237

Chapter 4: Installing the Power Supplies967. Lower the power supply locking handle to secure the power supply to the chassis, as shown in Figure 52.Fi

Page 238 - PoE Mode

SwitchBlade x8106 Chassis Switch Installation Guide97Installing the AT-SBxPWRPOE1 PoE Power SupplyThis section contains the installation procedure for

Page 239 - Port Pinouts

Chapter 4: Installing the Power Supplies98Figure 53. Removing the Blank Slot Cover from Power Supply Slot A3. Remove the power supply from the shippin

Page 240

SwitchBlade x8106 Chassis Switch Installation Guide99Figure 54. Items Included with the AT-SBxPWRPOE1 Power Supply ModuleNoteStore the packaging mater

Commentaires sur ces manuels

Pas de commentaire