Allied-telesis AT-SBx81CFC960 Manuel d'utilisateur Page 89

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 322
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 88
89
Chapter 5
Installing the Chassis in an Equipment
Rack
This chapter describes how to install the AT-SBx8106 Chassis in an
equipment rack. This chapter contains the following sections:
“Required Tools and Material” on page 90
“Preparing the Equipment Rack” on page 91
“Unpacking the AT-SBx8106 Chassis” on page 94
“Removing the Rubber Feet” on page 96
“Adjusting the Equipment Rack Brackets” on page 98
“Installing the Chassis in the Equipment Rack” on page 100
“Removing the Shipping Brace” on page 104
“Installing the Chassis Grounding Wire” on page 105
Vue de la page 88
1 2 ... 84 85 86 87 88 89 90 91 92 93 94 ... 321 322

Commentaires sur ces manuels

Pas de commentaire