Allied-telesis x610 Series Layer 3 Manuel d'utilisateur Page 95

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 128
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 94
R
PS
R
EADY
STACKING
risk of
rvicing
AT-LX44CPUCVR
AT-x6EM/XS2
12
L/A
L/A
POWER
SFP+SFP+
CLASS
1
LASER
PRO
DUCT
10G LINK
ACT
L/A
R
PS
R
EADY
STACKING
risk of
rvicing
AT-LX44CPUCVR
AT-x6EM/XS2
1 2
L/A
L/A
POWER
SFP+SFP+
CLASS 1
LASER PRO
DUCT
10G LINK
ACT
L/A
x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide
95
5. Verify that the handle on the SFP+ transceiver is in the upright
position, as shown in Figure 66, to prevent inadvertently removing the
transceiver.
Figure 66. Positioning the SFP+ Tran
sceiver Locking Handle
6. Remove the dust plug from the SFP+ transceiver, as shown in
Figure 67.
Figure 67. Removing the Dust Plug from an SFP+ Transceiver
7.
Connect a cable to the SFP+ transceiver, as shown in Figure 68. For
SFP+ optical and cabling specifications, consult the documentation
shipped with the module.
Vue de la page 94
1 2 ... 90 91 92 93 94 95 96 97 98 99 100 ... 127 128

Commentaires sur ces manuels

Pas de commentaire