Allied-telesis IE200 Series Manuel d'utilisateur Page 44

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 70
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 43
Chapter 3: Installing the Switch on a DIN Rail or Wall Mount
AT-IE200 Series Installation Guide 44
Installing the Switch on a DIN Rail
Observe the following requirements when choosing a DIN rail site for your switch:
The DC PSU(s) should be located near the switch and be easily accessible.
The site should allow for easy access to the ports on the front of the switch, so that you
can easily connect and disconnect cables, and view the port LEDs.
The site should allow for adequate air flow around the unit and through the cooling fins.
The site should not expose the switch to moisture or water.
The site should be a dust-free environment.
The site should include dedicated power circuits or power conditioners to supply
reliable electrical power to the network devices.
To install the switch on the DIN rail, hook the switch’s mounting bracket onto the DIN rail and rotate the
switch down to snap it into place.
Figure 9: Attaching the switch to a DIN rail.
Vue de la page 43
1 2 ... 39 40 41 42 43 44 45 46 47 48 49 ... 69 70

Commentaires sur ces manuels

Pas de commentaire