Allied-telesis AT-DC2552XS Manuel d'utilisateur Page 59

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 84
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 58
Stack Installation Guide for AT-2552XS L2 Data Center Switch
59
7. Refer to Table 9 on page 56 for the recommended fiber optic cable.
Insert the cable to the port on the transceiver, as shown in Figure 28,
until it snaps in place.
Figure 28. Attaching a Fiber Optic Cable to an SFP+ Transceiver
8. Repeat steps 6 and 7 for the cable installation into the remaining SFP+
transceivers that are installed.
Installing a SFP+
Direct Attach
Cables
The AT-SP10TW1, AT-SP10TW3 and AT-SP10TW7 10G direct attach
cables come in 1m, 3m, and 7m cable lengths respectively. These SFP+
cable modules are ordered and supplied separately from the
AT-DC2552XS.
Perform the following procedure to install a SFP+ direct attach cables:
1. Remove the dust plug from a SFP+ slot on the switch. Refer to Figure
29.
Figure 29. Removing the Dust Plug from a SFP+ Slot
Vue de la page 58
1 2 ... 54 55 56 57 58 59 60 61 62 63 64 ... 83 84

Commentaires sur ces manuels

Pas de commentaire