Allied-telesis 8100S Series Manuel d'utilisateur Page 96

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 140
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 95
Chapter 6: Powering On and Verifying the Stack
96
Figure 40. Switch Initialization Messages (Continued)
At this point, the stack is operational and ready to forward network traffic.
Before connecting the network cables, go to “Verifying the Installation” on
page 101.
Note
After the stack becomes operational, the stack ID LEDs on the
master and member switches flash the ID numbers and code letter
“H” every few seconds. This is normal for the LEDs when the
switches are operating in a stack configuration.
Stack topology discovery is in process... Please Wait
Loading configuration file “boot.cfg” .... done!
Sending Configuration file to all slaves. Please wait...
00000001
Sending configuration file done!
Press <ENTER> key to connect...
New Switch 2 (00:15:77:99:99:91) is added into stack
Vue de la page 95
1 2 ... 91 92 93 94 95 96 97 98 99 100 101 ... 139 140

Commentaires sur ces manuels

Pas de commentaire