Allied-telesis 8100S Series Manuel d'utilisateur Page 62

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 140
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 61
Chapter 3: Beginning the Installation
62
Installation Overview
Table 15 lists the installation procedures for a stack of 8100S Series
switches. The procedures should be performed in the order presented in
the table.
Table 15. Installation Procedures
Step Procedure
1 “Reviewing Safety Precautions” on page 63
2 “Planning the Installation” on page 67
3 “Unpacking the Switch” on page 69
4 “Installing the Switches in an Equipment Rack” on
page 72
5 “Labeling the Switches” on page 77
6 “Verifying and Setting the Stack ID Numbers” on page 82
7 “Cabling the Stacking Ports” on page 87
8 “Powering on AC Switches” on page 92 or “Powering On
DC Switches” on page 97
9 “Verifying the Installation” on page 101
10 “Cabling the Twisted Pair and Fiber Optic Ports” on
page 104
11 “Installing Optional SFP Transceivers” on page 106
Vue de la page 61
1 2 ... 57 58 59 60 61 62 63 64 65 66 67 ... 139 140

Commentaires sur ces manuels

Pas de commentaire