Allied Telesis AT-PBC18 Guide d'installation Page 13

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 62
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 12
PowerBlade PBC18 Quick Install Guide
3
Status LEDs
Table 1 defines the power and management LEDs.
Table 1 Status LEDs
LED Color Description
Power Modules
PWR1 Green The main power supply is functioning normally.
PWR2 Green The optional redundant power supply, if installed, is functioning
normally.
Management Module
Status Amber The module is performing a self-test.
Flashing
Amber
The module is downloading the firmware from a host PC.
Red The module or management software is malfunctioning.
Green The module is installed and online.
LINK Green A valid link has been detected on the RJ-45 port.
100M Not used at this time.
FDX Not used at this time.
Vue de la page 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 ... 61 62

Commentaires sur ces manuels

Pas de commentaire