Allied-telesis x510 Series Manuel d'utilisateur Page 94

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 122
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 93
Chapter 7: Powering On the Stack
94
Warning
Power cord is used as a disconnection device. To de-energize
equipment, disconnect the power cord. E3
Note
Pluggable Equipment. The socket outlet shall be installed near the
equipment and shall be easily accessible. E5
2. Wait two or three minutes for the switches to select a master switch
and to assign the ID numbers.
At this point, the stack is operational. The ID numbers are
automatically stored in special files in the flash memories of the
switches and are retained by the devices even if you reset or power
cycle the stack.
3. To continue with the installation, go to “Verifying the Stack” on
page 95.
Vue de la page 93
1 2 ... 89 90 91 92 93 94 95 96 97 98 99 ... 121 122

Commentaires sur ces manuels

Pas de commentaire