37
2. Apply AC power to the switch by plugging the power cord into the AC
power connector on the back panel of the unit, as shown in
Figure 15.
Figure 15. Connecting the AC Power Connector to Switch
Warning
Power cord is used as a disconnection device: To de-energize
equipment, disconnect the power cord. 5
3. Plug the other end or the power cord into a wall outlet.
4. Verify that the POWER LED is green. If the LED is OFF, refer to
“Troubleshooting” on page 38.
The switch is ready for network operations.