Allied Telesis AT-S82 Guide d'installation Page 32

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 52
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 31
Chapter 2: Installation
32
Unpacking the Switch
To unpack the switch, perform the following procedure:
1. Remove all components from the shipping package.
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.
2. Place the switch on a level, secure surface.
3. Ensure that the following hardware components are included in the
package:
Two rack-mount brackets
Eight rack-mount bracket screws (black)
Four wall-mounting screws (stainless steel)
Four plastic anchors (for wall-mounting)
Four rubber feet (for desktop use)
One power cord
Documentation CD
If any item is missing or damaged, contact your Allied Telesis sales
representative for assistance.
Vue de la page 31
1 2 ... 27 28 29 30 31 32 33 34 35 36 37 ... 51 52

Commentaires sur ces manuels

Pas de commentaire