Allied Telesis AT-S80 Guide d'installation Page 38

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 44
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 37
Chapter 2: Installation
38
Powering On the Switch
To power on the switch, perform the following procedure:
1. Plug the power cord into the AC power connector on the back of the
switch, as shown in Figure 14.
Figure 14. Plugging in the AC Power Cord
2. Plug the other end of the power cord into a wall outlet.
3. Verify that the POWER LED is green. If the LED is OFF, refer to
Chapter 3, “Troubleshooting” on page 39.
The switch is now powered on and ready for network operations. For
information on how to manage the switch, refer to the AT-S80
Management Software User’s Guide.
Warning: Power cord is used as a disconnection device. To de-
energize equipment, disconnect the power cord.
E3
Pluggable Equipment. The socket outlet shall be installed near
the equipment and shall be easily accessible.
E5
871
Vue de la page 37
1 2 ... 33 34 35 36 37 38 39 40 41 42 43 44

Commentaires sur ces manuels

Pas de commentaire