Allied Telesis SWITCH AND SWITCHBLADE XEM-2XP Guide d'installation Page 21

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 23
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 20
Expansion Modules
20
6. Verify the installation.
If you have a terminal connected to the asyn0 port, any error message is
displayed during installation.
Confirm there is no error message about installation in the log file and that
the switch has recognised the XEM, by using the commands:
awplus>show system
awplus>enable
awplus#show log
XEM_IG.fm Page 20 Monday, July 19, 2010 10:40 AM
Vue de la page 20
1 2 ... 16 17 18 19 20 21 22 23

Commentaires sur ces manuels

Pas de commentaire