Allied Telesis AT-FH705E Guide d'installation Page 28

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 51
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 27
14
5. Attach the data cables to the switching hub
ports. Do not use a cross-over cable to connect
workstations or servers to ports 1 through 5.
Do not use a cross-over cable to connect
another switch or hub to the Uplink port.
Note
You can use either port 5 or the Uplink
port on an AT-FH705E Switching Hub,
but you cannot use both simultaneously.
6. Go to the procedure “Verifying and
Troubleshooting the Installationon page 16.
Installing the Unit on a Wall
For wall-mount installation, you can position
the device vertically or horizontally on the wall
using the keyhole cutouts in the bottom of the
hub chassis.
1. If previously attached, remove the rubber feet
and all cables and the DC power cord from the
device.
2. Select a wall location for the device.
Vue de la page 27
1 2 ... 23 24 25 26 27 28 29 30 31 32 33 ... 50 51

Commentaires sur ces manuels

Pas de commentaire