Problem 5: A twisted pair cable is connected to the Stack
port on the management module, but the port’s Link/Activity
LED is off.
Solutions: Try the following:
Verify the next chassis in the stack is powered on and
operating properly.
Verify the twisted pair cable is securely connected to the
Stack port on the management module and to the Stack
port in the next chassis.
Verify you are using the correct type of cable for the port
and have not exceeded the maximum length. For cable
specifications, refer to “Cable Requirements” on
page 42.
Note
If you need further assistance, please contact Allied
Telesis Technical Support. Refer to “Contacting Allied
Telesis” on page 14.